Is this for structural capacity or load carrying (soil) capacity? In driving into sands/silty sands, etc. I prefer the closed end steel tube pipe piles. Into shale bedrock or into till, the H-piles might be better used. I know of a case history where there was need to retap H-piles and they ended up going down quite a distance further on retapping. Really, they are two different piles each with its own best use. Don't use H-piles in sands (my recommendations) for they could drive "forever" (or would seem to - not really "forever" but for quite a long long way.) Thanks BigH,

I believe the piles are designed for both bearing and friction. The geotechnical report stated worst case soil seemed to be 70' of soft clay, with silty sand and better soil beneath the clay; on average 5 blows per foot in clay and 40 blows per foot in the soil below. I was asked by my client to approximate the weight of an equivalent H-pile to the 12 dia. steel pipe.

Please let me know if you feel the following method is somewhat accurate for determing an H-pile. At the steel tube institute web site I found a load chart for a 12.25" dia steel tube filled with concrete. The KL values only go up to 40', so, I determined the E value of the composite section backing out the given loads. I then recalced the allowable load for an unbraced section of 70' with k = 0.7 (pinned at top, fixed at the bottom). The allowable load was 108 kips, which coincided with the geotech report of 50 ton capacity. I then calculated several H-piles. A HP13x87 was the closest, I think I got an allowable load of 107 kips.

I was also curious as to where to find the 12" dia. pipe with 1/4" wall thickness? AISC pipes start their thickness larger than .25" at 12" dia. HSS tubes was the closest, @ 12.25" dia. with 1/4" thickness.

I know I took a shot in the dark on this one... your thoughts are very much appreciated.

Do you feel the H piles with the soils described would require a much longer length than the pipe?

Thanks again,
Mark
Mark: Will give it some thought - geotechns usually give the allowable loads and leave it up the structural designer to ensure that the structural capacity isn't exceeded. How many piles have "failed" due to structural exceedence??? I believe that the structural criteria are usually a bit more conservative than the geotech loading. Anyone else??

For pipe pile dimensions, etc., why don't you call Franki or other pile driving firm (Bermingham in Canada) and query their rep?? They are usually quite helpful (I'm assuming Franki is still Franki!!)

Another thought - one thing to keep in mind is downdrag forces. With your pile going through 70ft of soft clay - if there is any consolidation, it could impact some neg skin friction. With the pile tip in soil and not on rock, it won't be as much because of the permitted tip movement but still should be a consideration when determining the loads to be carried by the piles.

Why only steel piles?? You might want to consider an expanded base pile in the sand - I don't think that 80ft is too deep and might be able to get much larger load carrying - both from geotech and structural point of view.

Steel piles and pressure pipes – quality that lasts - SSAB

Ramfjord Bridge - Crossing an Arctic fjord on RR/20 LDP piles

Ramfjord Bridge is located in Troms County in Northern Norway, 600 km north of the Arctic Circle. This is a vital infrastructure project in the area that will connect the southern part of the region to the city of Tromsø. With a population of around 42,000 Tromsø is the biggest city north of the Arctic Circle in the Nordics The region has a total population of around 79,000 and growing tourism provides over 3 million travel days per year. The Northern Lights, whale safari, skiing and breathtaking scenery are popular attractions.

Check now

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/ramfjord-bridge-norway"> Read more

Hailuoto Causeway

Road access to Hailuoto has been studied since the early s. Current general plan was made in and the HAIKI-alliance for the project was formed in . The construction began in May and it will be completed in . Economically the road access in quite expensive, but on the other hand both of the ferries are getting old and they need to be replaced with new ones. Also the continuous operating costs of the ferries are not low.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/hailuoto-causeway"> Read more

Ocean Space Center: Pioneering Maritime Innovation in Trondheim

The RD® pile wall solution was chosen due to the undulating bedrock profile and its hard characteristics. It was considered a safe and stable solution. Fundamentering AS has for a long time been one of SSAB’s largest pile customers in Norway, especially within the large diameter pile aspect.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/oceanspacecenter"> Read more

Pumping station 40 - Luleå

Luleå is a region in growth. Its existing water and waste system is now 60-100 years old and in great need of upgrading to deal with the growing population. By , the population is expected to reach 100 000 inhabitants. “Östre länken” was initiated in and will be ready in . It consists of 4 new pumping stations and 20 km of water pipes with a diameter of up to 2 meters. This is Luleå Municipality’s biggest construction project ever and has an estimated price tag of up to SEK 2bn. There are already 70 pumping stations in the area to ensure the transportation of fresh water from the Lule River to end users and then transport the used water back to Uddebo wastewater treatment plant.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/lulea-pumpstation"> Read more

Reconstruction of Klaipeda Northern Breakwater

In the project ‘Reconstruction of Klaipeda Northern Breakwater’, the entrance of the harbour of Klaipeda was strengthened and renewed. In the course of this construction work, a retaining wall was built underwater at the foot of the breakwater at the narrowest point of the entrance. Through the installation of this wall, it was possible to design a rectangular cross-section between the northern and southern breakwaters, thus achieving a depth independent of the breakwater slope. Main contractor for the project was Depenbrock Ingenieurwasserbau GmbH & Co. from Germany.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/klaipeda-northern-breakwater"> Read more

Flatholmen quay in Ålesund, Norway – build on LDP from SSAB

Ålesund is a large Norwegian harbor for cargo and cruise ships. The fishing industry is well-established in the area together with manufacturing of furniture. This may explain the 65,000 containers that move through the area each year, making it one of Norway’s largest container harbors. Two billion fishmeal is exported from this region worldwide each year. Ålesund is also located on the doorstep of picturesque Norwegian fjords and majestic mountains, providing easy access for cruise tourism.

Jianhua Holdings Group supply professional and honest service.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/alesund-norway"> Read more

Underpinning of As Oy Matti in Turku, Finland

Residential building of As Oy Matti was originally built on end bearing timber piles in the end of s. The level of the building has been followed for some years and the first leveling data is from . During the first years of leveling, the building was in practice non-settling. Since there has been clear settlement on one area of the building. The settlement rate accelerated during years and , which emerged the need for underpinning of the building.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/as-oy-matti-turku"> Read more

New ecovillage in Parainen, Finland to be carbon negative

Construction company Godai Oy is building a carbon-negative small house ecovillage to Parainen, Finland. Godai is concerned about the environmental aspects of climate change in the construction industry and this construction project has high goals, as the plan is to build Finland’s first carbon-negative small houses. According to the Ministry of the Environment, construction and buildings account for about one third of Finland’s greenhouse gas emissions.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/godai-parainen"> Read more

SSAB steel piles to Finland’s largest piling site

Metsä Fibre, part of Metsä Group, is building a new bioproduct mill in Kemi next to existing pulp mill. The new mill will consume 7.6 million m3 of wood in a year and produce 1.5 million tons of pulp of which 70 % will be exported. Metsä Fibre’s investment to Kemi bioproduct mill is worth 1.85 billion euros and it will increase Finland’s export revenue with 0.5 billion euros annually. SSAB supplied displacement piles and micropiles for this new bioproduct mill, which Metsä Fibre is currently building in Kemi, Finland.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/metsa-fibre-kemi"> Read more

Waterproofing of the earth dam of the Melo power plant

The Kokemäenjoki river is one of the most important hydropower production areas in Finland. The Melo hydroelectric power plant in Nokia was built in the Kokemäenjoki river basin at the turn of the s. The fall height of the power plant is 20 meters. In total, the dam is 123 meters long. The power plant has a capacity of 68 megawatts and an annual production of 200 GWh.

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/melon-pato"> Read more

SSAB Large diameter piles in deep and steep Norwegian fjords

Green shipping has long been a goal for Norwegian transportation. This has led to heavy investments in electric and hybrid transportation ferries. These ferries are used to allow road traffic to pass over the huge number of fjords along the Norwegian coast line. In , 70 ferries out of a total 200, more than 1/3, had been replaced by electric ones. This transition has been backed by national funding and has also triggered demand for infrastructure development.

Are you interested in learning more about Steel Pipe Piles? Contact us today to secure an expert consultation!

span]:text-inherit text-[--btn-content-inv] before:bg-[--btn-bg-standard] hover:text-[--btn-content-hover] hover:before:bg-[--btn-bg-hover] active:before:bg-[--btn-bg-pressed] disabled:text-[--disabled-content-inv] disabled:before:bg-[--disabled-bg] [&:disabled>span]:text-[--disabled-content-inv] [&>span]:text-[--btn-content-standard] focus-visible:outline-none focus-visible:ring-2 focus-visible:ring-offset-2 focus-visible:ring-[--border-focus] focus-visible:shadow-focus mt-auto self-start" href="/en/brands-and-products/steel-categories/steel-piles-and-pressure-pipes/customer-cases/norwegian-fjords"> Read more

27

0

Comments

Please Join Us to post.

0/2000

All Comments ( 0 )

Guest Posts

If you are interested in sending in a Guest Blogger Submission,welcome to write for us!

Your Name: (required)

Your Email: (required)

Subject:

Your Message: (required)